Completed Projects

Client

Project Name

Start Date

Finish Date

Project Cost Rs.

Location

Role

HIGHWAYS & BRIDGES
Punjab Highway Department Dualization of Road from Muzaffargarh to Dera Ghazi Khan Km No: 43.00 To 74.00 Length 31.00 Km, (i/c Proposed Bypasses Length 33.90 Km) (Group-I) Length 23.65 Km) District Muzaffargarh

Oct. 2017

Dec. 2019

3077 Million

Muzaffar Garh

Main Contractor

Punjab Highway Department Dualization of Khanewal Lodhran Road (G-1. KM No. 0.00 to 13.00 Length= 13 KM in Dist. Khanewal.

May 2017

Jun. 2018

2153 Million

Khanewal

Main Contractor

Punjab Highway Department Construction of High Level Bridge Over River Jhelum At Langarwala Pattan i/c Connecting Roads District Sargodha/ Khushab.

Dec. 2014

Mar. 2018

1481 Million 1837 M (Revised)

Chota Sahiwal

Main Contractor

National Highways Authority (NHA) Inner Ring Road, Multan. Kalma Chowk & Double Phattak Flyovers (Pkg-III) (SARCO-MSL JV)

Mar. 2010

Sep. 2011

1262 Million 1596 (Revised)

Multan City

Lead Partner of JV (95%)

NHA Construction of 6-Lane Highway (08 Km) From Double Phattak to Chowk Nag Shah, Mutlan.

Oct. 2012

Nov. 2015

1441 Million

Multan

Partner of JV

Punjab Highway Department Dualization of Road from Bahawalpur to Hasilpur, Length: 77.25 Km Dist. Bahawalpur Reach Km No. 11.56 to 15.86 & 17.08 To 29.78 (L:17 Km) Group-I

Mar. 2014

Jun. 2016

1012 Million

Bahawalpur

Main Contractor

Punjab Highway Department Construction of Flyover on Khanewal – Lodhran Road at Maitla Chowk in District Vehari.

May 2017

Jun. 2018

1010 Million

Chowk Maitla Dist. Vehari

Main Contractor

NHA Construction of Flyover at Shaheen Chowk on Gujrat Bypass (N-5) in District Gujrat.

April 2016

Feb. 2017

820 Million

Gujrat

Main Contractor

Punjab Highway Department W/I of Jhang Sahiwal Sargodha Road Km No. 59.00 to 114.45 Km (Reach 59 to 86) L:27 Km in Dist. Sargodha (G-I)

Dec 2015

Jun. 2018

815 Million

Chota Sahiwal

Main Contractor

National Highways Authority (NHA) Construction of Sultan Bahoo Bridge over River Chenab Linking Shorkot, Garh Maharaja Pkg–I: Main Bridge (SARCO-MSL JV)

June 2010

Mar. 2015

770 Million

Shorkot

Lead Partner of JV (95%)

Water and Power Development Authority (WAPDA) Golen Gol Hydropower Project – Contract Lot-2 & Lot-3.1

Feb. 2011

Dec. 2016

9420 (7520+1900) Million

Dist. Chitral

Partner of JV (30%)

Punjab Highway Department (NLC) Construction of High Level Bridge L 900 Rft. On River Soan Between Dist. Mianwali & Attock

Nov 2013

Jun. 2016

686 Million

Jand – Mianwali Road, Dist. Attock

Text Box: Completed Projects Sub Contractor

National Highways Authority (NHA) Const./Improvement of Road from Hyderabad Badin Road to Mirwah Sanjar Chang Road. Package-II: From Haji Sawan Road To Sanjar Chang Road (24.716 Km)

June 2010

Mar. 2013

664 Million

Hayderabad Badin Road

Main Contractor

Punjab Highway Department Dualization of Road from Bahawalpur to Hasilpur (L:77.25 Km) Group-II-A, Reach Km No. 29.78 to 39.38 (L:10 Km) Dist Bwp

Sep. 2015

Dec. 2016

630 Million

Bahawalpur

Main Contractor

Punjab Highway Department Conversion of Main Road Leading from Bahawalpur to G.T. Road into Dual C/Way Bahawalpur – Multan Road (L=3.35 Km)

August 2008

Jun. 2011

612 Million

Bahawalpur

Main Contractor

FDA Const. of Additional Lanes on Both Sides of R.B. Canal Road, Faisalabad

Mar. 2012

Sep. 2014

598 Million

Faisalabad

Main Contractor

Punjab Highway Department Construction of Over Head Bridge at Depalpur Chowk, District Okara.

Mar. 2017

Mar. 2018

595 Million

Okara

Main Contractor

Punjab Highway Department Dualization of Road from Bahawalpur to Hasilpur (L:77.25 Km) Group-II-B, Reach Km No. 39.78 to 49.78 (L:10 Km) Dist Bwp

Apr. 2016

April 2017

580 Million

Bahawalpur

Main Contractor

NHA Periodic Maintenance (Structural Overlay) Work Between KM 1452 to 1482 SB on N-5 (Contract No. PM-2014-15-PN-05)

Feb. 2016

Aug. 2016

474 Million

Dina – Gujar Khan on N-5

Main Contractor

Punjab Highway Department W/I of Road from Vehari to Tibba Sultan Pur Len.45.21 Km In Vehari City. G-I=15.21 Kms.

Jun 2011

March 2014

369 Million

Vehari

Main Contractor

Punjab Highway Department Khadim-e-Punjab Rural Roads Programme Ph-II (Part-A) (Package District Khanewal)

Nov. 2015

May 2016

384 Million

Khanewal

Main Contractor

Punjab Highway Department Khadim-e-Punjab Rural Roads Programme (KPRRP) in Dist. Khanewal (Pkg 24)

May 2015

Sep. 2015

382 Million

Khanewal

Main Contractor

NHA PM (Structural Overlay) Work Between KM 1365 to 1358 SBC on N-5 (Contract No. PM-2014-15-PN-04)

Feb. 2016

Aug. 2016

345 Million

Gujranwala – Wazirabad on N-5

Partner of JV

Punjab Highway Department W/I of Shahi Road from Jetha Bhutta to Chowk Bahadarpur G-I From Km No. 132.4 to 162.0), L=29.6 Km

March 2007

Jun 2011

332 Million 423 M Revised

Rahim Yar Khan

Main Contractor

Punjab Highway Department W/I of Road from Gojra to Qadir Abad via Tariq Abad i/c Link Dera Mohkam, Length 26 Kms, District Mandi Bahauddin.

Dec. 2015

May 2016

327 Million

Dist. Mandi Bahauddin

Main Contractor

Ghosia Builders Construction of Flyover for G.Magnolia Park Housing Scheme. Gujranwala.

Jun 06

May 2008

310 Million

Gujranwala

Main Contractor

Punjab Highway Department Khadim-e-Punjab Rural Roads Programme Ph-III, Pkg No.11, Dist. Khanewal

Jun. 2016

Nov. 2016

307 Million

Khanewal

Main Contractor

Lahore Ring Road Authority (LRRA) Construction of Underpass at Bhaini Road (Package-12A)

Feb. 2014

Jul. 2015

306 Million

Lahore

Main Contractor

NHA PM (Structural Overlay) Work Between KM 1345+000 to 1358+600 NBC on N-5 (Contract No. PM-2014-15-PN-08)

Feb. 2016

Aug. 2016

295 Million

Gakhar – Wazirabad on N-5

Partner of JV

Works & Services Dept. Hyderabad Pkg No. 5602 – Reconst. & Rehabilitation of Road from Sehwan to Jhangara Road Mile 0/0 – 10/3 Dist. Jamshoro (“the work”)

Feb. 2012

Mar 2013

286 Million

Sehwan to Jhangara

Main Contractor

Punjab Highway Department Construction of Overhead Bridge on Empress Band from National Highway N-5 (Km No. 844) Near Highway Bridge over River Sutlej Towards Lashkar di Goth in Km No. 4 of Jhanghi Wala road in Dist. Bahawalpur (Length 9.00 Km) Northern Byepass (Group-II)

May 2011

Jun. 2014

284 Million

Bahawalpur

Main Contractor

Punjab Highway Department Rehabilitation/Improve. of Muridke Narowal Road Construction of Over Head Bridge Railway Crossing & W/I of Road Length = 3.75 km Dist Sheikhupura.

Jul 2011

Mar 2014

270 Million Revised 330 M

Sheikhupura

Main Contractor

Punjab Highway Department Dualization of Dehli Multan Road from 37-Phattic to Thingi from Km. No.584.00 to 586 & 589.9 to 594.55, Len = 6.65 Km in Dist Vehari.

March 2011

Dec 2012

207 Million

Vehari

Main Contractor

Punjab Highway Department Construction of Dual C/Way From Gujrat to Salam Interchange (Motorway) through Mandi Bahauddin (Const. of Bridge over R.Q Link Canal & Budhi Drain Alongwith Approaches L=1.82 Km)

Jun 2014

Jun 2015

200 Million

Gujrat

Main Contractor

Punjab Highway Department W/I of Karam Dad Qureshi-Kot Addu-Layyah Road Length = 90Km (G-III From Km 28.44 to 42.44=14 Km)

Dec 2008

Oct   2009

181.39 Million

Muzaffar Garh

Main Contractor

   Punjab Highway Department Construction of Bridge over Nullah Bunnah on Jhelum P.D. Khan Road in Km 28 in District Jhelum.

Jun-04

Aug 2005

170.0 Million (Revised)

Jhelum

Main Contractor

Punjab Highway Department Construction of Road from Jamilabad to Multan Airport, Length=1.13 Km in District Multan.

Mar 2015

Nov. 2015

141 Million

Multan

Main Contractor

National Highways Authority (NHA) Rehab/Impr Works of Shangla Top ~Alpuri Section, RH-01/2007-08(S) @ Km 25+000–31+500, N-90

June 2008

Nov. 2012

114.76 Million

N-90 Shangla Swat

Main Contractor

National Highways Authority (NHA) Rehab./Impr. Works of Shangla Top~Alpuri Section, RH-02/2007-08(S) @ Km 20+000–25+000, N-90

June 2008

Nov. 2012

109.63 Million

N-90 Shangla Swat

Main Contractor

National Highways Authority (NHA) Periodic Maint. (Functional) Work Vide Contract No. PF-PS-07-20-02 at Km 78+500-85+000 (N-70)

Nov. 2008

May   2009

101.596 Million (Revised)

(N-70)         Multan

Main Contractor

Punjab Highway Department Construction of Overhead Bridge on Railway Crossing on Kharian Dinga Road i/c Service Road in District Gujrat.

Feb-04

Jun 2005

101.23 Million

Kharian

Main Contractor

National Highways Authority (NHA) Construction of Bridge over Sakhi Sarwar Nullah N-70  D.G.Khan.

Feb-96

Dec 1997

100.00 Million

Sakhi Sarwar

Main Contractor